From plot to building permit in 5 steps
Own a plot but not sure where to start? A building permit begins long before the first line is drawn. In five steps: zoning status and the plot (zoning certificate, TAKS/KAKS ratios, setbacks, number of storeys, soil survey); preliminary design (brief, orientation and views, massing decisions); coordinated architectural, structural, mechanical and electrical construction drawings; chamber approvals, building inspection, site manager and fees; and finally the municipal review, any revisions and the building permit.
As project author and responsible engineer, we handle the whole process in-house, from zoning status to permit and from foundations to turnkey completion. The first meeting and plot assessment are free of charge.