AZER MİMARLIKEngineering & Construction Ltd.
Home  /  From the Site

From the Sitenotes from the field.

The work we share on Instagram is published here too: step-by-step notes from our sites and news from the office. See what happens before the concrete is poured.

Planning offices in a building whose tip is about 2 metres wide

New York's Flatiron Building (originally the Fuller Building) was completed in 1902, designed by Daniel Burnham's office D. H. Burnham & Co. and Frederick P. Dinkelberg. Set on a triangular plot, the building narrows to a tip about 1.8 metres wide. The floor plan has a service core in the middle, surrounded by some twenty offices, each with a different shape.

A curious detail: the original design had no women's toilets; later the toilets were placed on alternating floors, men's on even floors and women's on odd floors. This is the first stop in our series on iconic buildings of architectural history; next up is Villa Savoye. Photo: Irving Underhill, 1903, Library of Congress, public domain; floor plan schematically redrawn by Azer Mimarlık.

View on Instagram

How is a pitched roof waterproofed?

What lies beneath the tiles? Six steps, explained in 3D: the roof structure with posts and purlins, rafters about 50–60 cm apart; 18 mm OSB sheathing with a drip edge at the eaves; a waterproofing underlay laid from eaves to ridge with overlaps of at least 10 cm; counter battens along the slope; tile battens spaced to the length of the tile; and finally the tiles, a ventilated ridge strip and ridge tiles.

A dry home starts with a good roof.

Watch the video

How are a raft foundation and columns built?

Six steps on site, explained in 3D: excavation and about 10 cm of blinding concrete; an overlapping waterproofing membrane with about 5 cm of protective concrete; raft reinforcement with bottom and top mesh in both directions and 5 cm of cover; hooked column starter bars tied to the bottom mesh; the raft concrete poured in one go without interruption, vibrated and kept wet for at least 7 days; finally stirrups, formwork, a plumb check and the column concrete.

A solid building starts with a solid foundation.

Watch the video

Our Republic turns 103

What keeps a building standing is a solid foundation and the right proportions. Even our flag is drawn to dimensions set by law. Here's to many more centuries on the foundation laid in 1923.

We remember with respect and gratitude everyone who founded our Republic, above all Gazi Mustafa Kemal Atatürk. Happy Republic Day, 29 October.

View on Instagram

Our new look

We have renewed our Instagram profile with our new identity. Architecture, engineering and construction under one signature; from Urla to Karaburun, from design to turnkey.

From now on we share notes from our sites and office here and on Instagram at the same time.

Visit our profile

Raft foundation, step by step

The most important part of a house is the part you will never see. From our Kamukent site we explained the raft foundation step by step: excavation and blinding concrete, waterproofing, reinforcement, concrete and frame.

If you own a plot in Kamukent, we manage the entire process under one roof, from the soil survey to the permit and from the foundation to turnkey handover.

View on Instagram Watch the video
Let's get started

Let's talk about your plot,and design your home together.

The first meeting and plot visit are free of charge. Let's meet at our office in Mordoğan or directly on your plot.